Rural electrification. Renewable energy  N/A

barre-colore

 

Additional study on the electrification of the city of Kabinda

Country : DRC. .
Client : AFD (French Development Agency) .
Start Date : 2022-06-01
Completion Date : 2022-07-31
Value of services : 39 977.50 EUROS
Funder : AFD (French Development Agency ) .
Associate/Partner : VSI Afrique
   ---------------------------------------------------------------------------------------------------------------------------------
Description :
Following the pre-feasibility studies for the electrification of 21 DRC capitals carried out in 2020-2021 by IED and VSI Afrique, AFD requested IED to carry out a field mission to Kabinda to clarify, confirm or correct the hypothesesof the pre-feasibility study. In particular, it was a question of adjusting the demand for electricity and the means of production adapted to the locality.
   ---------------------------------------------------------------------------------------------------------------------------------
Description of the Actual Services Provided Electricity demand analysis
- State of play of the existing
- Updating population data
- Collection of consumption data from major consumers
Electricity generation
- Selection of a suitable site for solar photovoltaic production
- Visit to potential hydropower sites
- Analysis of the potential for electricity production from biomass
Update of the assumptions and results of the pre-feasibility study
• Key Final Deliverables:
o Supplementary study report