From this table, you can edit the details of a reference by clicking on the title link in blue.
You can also sort ascending or descending on each column by clicking on the title of the header (also in blue)

Reference Name of the project Main activity Country Year
442 Electricity Transmission System Upgrading and Development and Sector Reform Project Studies Cameroon 2019-2021
441 Feasibility study for the setting-up of a Sovereign Loan and an associated Technical Assistance and Capacity Building Program to support mini-grids development in rural areas of Myanmar Studies Myanmar 2019-2021
440 Feasibility study, tender document, assistance to contracting, supervision and control of the supply and installation of 16 mini-hybrid solar power plants (10 - 200 kWc) Technical assistance Ivory Coast 2018-2021
439 National Power Development Plan Technical assistance Cambodia 2019-2022
438 Preliminary Project Summary for 250 villages (off-grid) electrification Studies Niger 2019-2021
437 Studies, project management assistance & project management for the rehabilitation of the electricity networks of Bambari and Berberati Technical assistance Republic of Centrafrica 2019-2022
436 National Electrification Strategy (NES) Studies Uganda 2019-2021
435 Master plan for generation, transmission & distribution of electricity of Gabon at horizon 20 years Studies Gabon 2019-2021
434 Preparation of an Indicative Least Cost Geospatial Electrification Plan to Achieve Universal Access Studies Namibia. 2019-2021
433 Project instruction support for the security, extension and modernization of 4 hydro plants (4-8 MW) Studies Uzbekistan 2019-2022
432 Detailed Studies of Nchi small hydro power plant (2.5MW) and capacity building Studies Cameroon 2019
431 Assistance in project management for PV solar hybridization works and extension of networks for 29 remote localities Technical assistance Niger 2019-2022
430 Least Cost Geospatial Electrification Options Analysis for Grid and Off-Grid Rollout Studies Congo 2019
429 Detailed design study of a hydroelectric plant and creation of tender documents of Bafang SHPP site (2,5 MW) Studies Cameroon 2018-2019
428 Load Forecast Analysis until 2035 for the National interconnected power system Studies Madagascar 2018-2019
427 Technical Assistance to the SUNREF program for energy efficiency & renewable energy projects financing Technical assistance Cameroon 2018-2021
425 Modernization of the electrical network management software of the Nigerien Electricity Company; and georeferencing of networks to update the associated database Multiple Niger 2019-2022
424 Small Hydropowerplant (100 kW) feasibility studies for rural electrification project in 3 localities Studies Madagascar 2018-2021
423 GIS-Based electrification study for the ECOWAS Regional Access Project Studies Mali. Gambia. Guinea Bissau. Mauritania 2018-2019
422 Multi-Tier Measurement of Energy Access (Multi Tier Framework - MTF) Technical assistance DRC 2018-2019